FAQ

1. Work with an Buildings of Steel representative to design a building to suit your needs. 2. The design is sent to engineering for approval. 3. Apply for a permit to build your building. ›› Permit regulations vary by County and State, start investigating the requirements in your area as soon as you have decided to add a building to your property. 4. Make arrangements to have the building erected. 5. Plans return from engineering with stamp, your representative orders your building. 6. Building is delivered to your site.
1. Snow loading, wind speed, exposure, soil density variances, etc. 2. Aesthetics. ›› Windows ›› Trim ›› Siding Choices
1. Engineering Package—7 to 10 working days. 2. Permit approval—two to three weeks. ›› Check with your local building department for lead times in your area to get permit approval. 3. Building Delivery–2 to 3 weeks.
1. For overhead doors you need 18” additional height for door track and 3” on each side for the side door track. ›› What are you putting in the building? If your boat and trailer have a combined height of 10 feet, you need to plan on a building with 12 foot doors 2. Consider a canister door to save space.
Buildings of Steel allows your representative to accurately design a building to your specifications. Our program instantly calculates the price of the finished product (no more waiting days or weeks for a bid). With OutBack Calc we can design the building which fits your needs AND budget too!